The National Highway Authority (NHA) Executive Board has recommended thePC-I for the construction of the Muzaffarabad-Mansehra (China PakistanEconomic Corridor (CPEC) Link) at a cost of Rs. 44.72 billion forconsideration of CENTRAL Development Working Party/ Executive Committee ofNational Economic Council (ECNEC).
The Board meeting was presided over by Capt. (Retd.) Muhammad Khurram Agha,Chairman, NHA. According to the official documents, the Board deliberatedupon the PC-I for the construction of Muzaffarabad – Mansehra (CPEC Link)(26.6 km). The Board recommended the PC-I at a cost of Rs. 44.72 billionfor consideration of CDWP/ECNEC.
The Board also considered the PC-I for the construction of the Road betweenShounter (Kel) to Rattu (Gorikot) along with the Tunnel at Shounter (81KM). The NHA Executive Board recommended the PC-I for Road between Shounter(Kel) to Rattu (Gorikot) along with the Tunnel at Shounter (81.1 KM) at acost of Rs. 61.162 billion for consideration of CDWP/ECNEC.
The NHA Executive Board recommended the PC-I for the construction of Sui –Kashmore Highway 69.7 Km at a cost of Rs. 28.396 billion for considerationof CDWP/ECNEC.







