ISLAMABAD – The government has released a sum of Rs 33,365.570 million forvarious water and power projects in annual Public Sector DevelopmentProgramme (PSDP) for fiscal year 2018-19 so far.
According to the data of Planning Commission, an amount of Rs 320 millionhas been released for the construction of Basool Dam Tehsil Ormara,District Gwadar, sum of Rs 4550 million for Extension of Right Bank OutfallDrain (RBOD-II) from Sehwan to Sea.
A sum Rs 800 million has been released for Kachhi canal project phase-1, Rs700 for lining of distributaries and minors in Sindh, Rs 693 Kurram TangiMultipurpose dam storage, Rs 700 lower Indus right bank irrigation anddrainage project, Rs 700 Makhi Farash link canal project, Rs 400 millionfor Gruk Storage dam district Kharan and Rs 4,736 million for Diamer Bashadam project ,
A sum of Rs4550 million has been released for Kachhi Canal Project, Rs600million for Remedial Measure to Control Water Logging (Muzaffargarh), Rs400million for Remodeling of Warsak Canal System (Peshawar) and Rs 400 millionfor Nai Gaj Dam (Dadu).
A sum of Rs 300 million has been released for strengthening of TSG centrefor Grid System operation and maintenance, Rs 100 million for 220 –KVMastung, Rs 100 for 500-KV Lahore North.
An amount of Rs40 million was released for construction of 132KV gridstation at Dadar, Rs20.546 million for construction of 132 KV grid stationat Deep Sea Port (Gwadar) and Rs20 million for 132KV at Isplinji (Mastung).







