ISLAMABAD:Ninety feet damaged portion of water channel of Naltar hydelpower station has been repaired and power supply from eighteen MW station will start tomorow afternoon.
The repair work started in 12th of this month.
It may be recalled that a massive landslide had damaged the water channel. APP/AFP